Sr. No. | Segments Served | Name of Work | Services Provided |
1 | Other Power Plant | 100-MLD Cap Sewage Treatment Plant | Geotechnical Investigation, Material Testing |
2 | Metros | Construction of Elevated Viaduct from Thaltej Gam to End of Western Ramp [Ch- 710 to + 7503] I E-W Corridor R2 including Bridge over Sabarmati river and 7 Stations. | Geotechnical Investigation, Field NDT, Material Testing |
3 | Other Power Plant | AUTOMOTIVE ELECTRONICS POWER PVT. LTD. | Field NDT, Plate Load Test, Material Testing |
4 | Buildings | Construction of Cricket Stadium for GCA at Motera, Ahmedabad, Gujarat | Geotechnical Investigation, Material Testing |
5 | Factories | Maruti Suzuki Motors Gujarat Ltd. | Geotechnical Investigation, Plate Load Test, Material Testing |
6 | Road | Construction of Flyover Bridge at Sanathal Junction & Shantipura Junction | Field NDT, Plate Load Test, Material Testing |
7 | Factories | Proposed Maruchi Kuma Factory at JIP mandal, Gujarat | Geotechnical Investigation, Material Testing |
8 | Highway | Construction of Eight Lane Vadodara Kim Expressway From Km 323.00 to 355.000 (Sanpa to Padra Section of Vadodara Mumbai Expressway) in the state of Gujarat Under NHDP Phase-VI (Phase IA – Package II) | Field NDT, Material Testing |
9 | Buildings | Construction of Non- Residential Underground specialised RCC integrated structure at Vadsar | Field NDT, Material Testing |
10 | Road | Construction of Flyover at Ajit Mill Junction on 132 feet ring road in Ahmedabad. | Field NDT |
11 | Highway | Six Laning from Existing KM 494.410 (Design Chainage 540.595) to Existing KM 509+550 (Design Chainage 555.905) of NH-8 in the State of Gujarat (Design Length 15.310 KM) on EPC Mode under NHDP Phase- V (Package- VII) | Field NDT, Plate Load Test, Material Testing |
12 | Factories | Construction of Factory Building at Site in SEZ II, Changodar, Ahmedabad – for Cadila Healthcare Ltd | Geotechnical Investigation, Field NDT |
13 | Factories | Construction of Factory Building at Site in Navapura, Ahmedabad – For Cadila Healthcare Ltd | Geotechnical Investigation |
14 | Buildings | Vadaj Slum Rehabilitation Work, Vadaj, Ahmedabad | Field NDT |
15 | Power Distrubution | 400/220 kV Guna Substation under POWEGRID BHIND-GUNA TRANSMISSION LIMITED. | Geotechnical Investigation, Field NDT |
16 | Metros | Construction of Pedestrain bridge at vastral metro junction | Field NDT |
17 | Factories | Plastic Omnium Auto Inergy India Pvt. Ltd., Plot no-12, Block No.-334, 335, JV Park Village-Hansalpur, Gujarat Industrial Area, Phase-I, Gujarat. | Geotechnical Investigation |
18 | Railways | CONSTRUCTION OF 4 LANE ROB ON AHMEDABAD – VIRAMGAM B.G. RAILWAY LINE BETWEEN KM. 510/6 & 510/7 IN LIEU OF LC NO. 6 CONNECTING CHENPUR TO GODREJ GARDEN CITY – S. G. HIGHWAY AT JAGATPUR, AHMEDABAD. | Geotechnical Investigation, Field NDT |
19 | Metros | Thaltej RSS, Ahmedabad Gujarat. | Geotechnical Investigation, Field NDT |
20 | Factories | Construction of SMG new gate and fire tendet shift work, Block No.-334, 335, JV Park Village-Hansalpur, Gujarat Industrial Area, Phase-I, Gujarat. | Geotechnical Investigation, Field NDT,Plate Load Test |
21 | Power Distrubution | Detailed Geotechnical Investigation work at 400 KV Bina – Guna D/C Transmission Line.” & “Detailed Geotechnical Investigation work for 220 KV D/C Guna – Shivpuri Transmission Line. | Geotechnical Investigation |
22 | Road | Construction of 4 lane new bridge across khari river near Hathijan connecting vinobabhave nagar and vivekanand nagar at ahmedabad. | Field NDT |
23 | Oil & Gas | Upgradation of Fire System at ONGC Kalol Tank, Kalol, Gujarat | Field NDT |
24 | Highway | Puintola to Icchapuram (Section from Km .419+600 to Km.484+000) of NH 16 in the state of Odisha. Site Code: RD-Puintola-Icchapuram OR (A145) | Field NDT |
25 | Railways | Design and construction of Civil, Building and Track works for Double line Railway including Testing and Commissioning on Design-Build Lump Sum Price Basis for Iqbalgarh – Vadodara Section for Western dedicated Freight Corridor (Phase – 1) – Contract | Geotechnical Investigation, Field NDT |
26 | Metros | Construction of Elevated Viaduct From Dead End P1 to P59 In E-W Corridor R2 Including Station Thaltej Gam Including Western Side Transition Span Between Station and Viaduct For Ahmedabad Metro Rail Project Phase-1 | Field NDT, Material Testing |
27 | Solar Power | 210MW Solar PV Power Project at Babarzar – IND01 | Field NDT, , Material Testing |
28 | Metros | Construction of i) 8.124 km elevated viaducts and 8 stations from Ch. 17343.443m to 25467.443m, ii) 5.420 km elevated viaducts and 3 stations from GNLU to GIFT City and iii) 0.815 km elevated viaducts and additional platform | Field NDT, , Material Testing |
29 | Metros | Construction of Elevated metro rail station 06 numbers including viaduct portion within the stations and transition spans construction of 6.478 km elevated viaducts and 5 stations from Ch. 25467.443M to | Field NDT, Material Testing |
30 | Road | Construction of Flyover Bridge along Sardar Patel Ring Road In AUDA Area (JOB No.: 43/2013-2014) | Plate Load Test, Material Testing |
31 | Highway | Upgradation to 6 lane with paved shoulders of Sayla-Bamanbore section of NH 8A (New NH47) from Km, 138+000 to km 182+490 on EPC mode in the state of Gujarat. | Plate Load Test, Material Testing |
32 | Metros | Design and Construction of underground stations and tunnel including finishes excluding PHE, Electrical and HVAC from chainage 14328.88m to chainage 11882.88m. | Plate Load Test, Material Testing |
33 | Road | Construction of split Flyover Bridge at Viratnagar Junction from Soni ni Chalo Khodiyarnagar in Ahmedabad City | Plate Load Test, Material Testing |
34 | Road | Construction of 4- Lane ROB on Ahmedabad-Virangam B.G. Railway Line between RLY. K.M 509/7 & 509/8 on 30.0m wide T.P. road connecting CIMS Hospital and 100 Hebatpur Road at Ahmedabad | Field NDT, Material Testing |
35 | Road | Reconstruction of Khokhara ROB (2×2 lane) with dismantling of existing approach at RLY KM 493/14-16 between Maninagar – Ahmedabad Station | Plate Load Test |
36 | Other Power Plant | Zydus Biological Plant | Plate Load Test |
37 | Road | Ranasan Railway Flyover Bridge | Plate Load Test |
38 | Road | Construction of Flyover Bridge on S.P Ring Road at Dehegam Naroda Junction in AUDA Area.(Job No-22/2018-19) | Plate Load Test, Material Testing |
39 | Buildings | Engagement of Construction & Maintenance Agency (CMA) for Regional Science Museum at Patan. | Plate Load Test, Material Testing |
40 | Other Power Plant | EPC of Sewerage Pumping Station & 100 MLD output Capacity of Sewerage Treatment Plant at Vinzol In East Zone of Ahmedabad Municipal Corporation, Ahmedabad | Plate Load Test, Material Testing |
41 | Solar Power | IP-1 Location of 22 MW FSPV Power Plant of BHEL-NTPC at RGCCPP-NTPC Power Plant, Chingoli, Kayankulam, Dist.-Alappuzha, Kerala – 690506 | Plate Load Test, |
42 | Airports | Construction of Airfield Pavements for New Green field Airport at Holongi, Itanagar, Arunachal Pradesh | Geotechnical Investigation |
43 | Power Distrubution | Construction of 765 kV D/C Lakadia-Banaskantha Transmission line | Geotechnical Investigation,Material Testing |
44 | Other Power Plant | Engineering, Procuring, Constructing, Commissioning (EPC) of Sewage Pumping Station along with Rising Main and 30 MLD capacity Sewage Treatment Plant at Maleksaban, Ahmedabad along with Operation and Maintenance of the entire proposed Facilities including SPS along with Rising Main and Sewage Treatment Plant facilities for Ten (10) years | Geotechnical Investigation, Material Testing |
45 | Factories | TOYO INK Gravure factory at Plot no. D-2/23, Dahej – D-H, GIDC Estate village: Julva, Gujarat 392130 | Field NDT, Material Testing |
46 | Road | Construction Of 4-lane Road Over Bridge on Ahmedabad-Viramgam BG Railway Line Between Railway KM 524/3 & 524/4 In Liue Of Lc No.22-A On Sanand-Chekhla-Kadi Road Sh Between Km.31/2 To 31/4 | Field NDT, Material Testing |
47 | Solar Power | Design, Engineering, Supply and Procurement, Construction, Operation and Maintenance of 20 MW solar Photovotic grid Connected Power Plant at Virdi Gujarat | Field NDT, Material Testing |
48 | Solar Power | Design, Engineering, Supply and Procurement, Construction, Operation and Maintenance of 40 MW Solar Photovoltaic grid Connected Power Plant at Haripar Gujarat | Field NDT, Material Testing |
49 | Solar Power | Design, Engineering, Supply and Procurement, Construction, Operation and Maintenance of 25 MW Solar Photovoltaic grid Connected Power Plant at Palitana Gujarat | Field NDT, Material Testing |
50 | Thermal Power | Thermal Generation Project, CGPL – 4150 MW Thermal Power Plant, Mundra | Field NDT |
51 | Metros | Construction of 11.6 Km Elevated Viaduct from Kadarsha Ni Nal to Dream City Dead End Including Ramp for Depot entry near Dream City and 10 stations (Excluding E&M, Architectural Finishing and Roofing) for Surat Metro Rail Project Phase-1, Package CS-1 | Field NDT |
52 | Highway | Construction Of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from Km 48.520 to Km 71.060 Section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode under Bharatmala Pariyojana in State of Gujarat (Package-III). | Field NDT, Material Testing |
53 | Buildings | Construction of 952 EWS Residential Flats Including Internal Infrastructure & Development work, Ahmedabad (Phase-6) EWS Package-36 | Field NDT |
54 | Factories | Proposed Structure at Zydus Wellness Limited, Saket Estate, Village Moraiya, Changodar, Sarkhej-Bavla Rd, Ahmedabad, Gujarat | Field NDT |
55 | Buildings | Project of U.P. Public Works Department – Govt. Medical College & Upgradation of District Hospital at Sultanpur | Field NDT |
56 | Road | Construction of Border Road from BP1175 to G17. | Field NDT, Material Testing |
57 | Factories | Proposed Civil Structure for Amneal Pharmaceuticals Pvt. Ltd. At Bavla, Ahmedabad-Rajkot Highway. | Field NDT |
58 | Solar Power | 20MW SOLAR PV PLANT NTPC GANDHAR | Field NDT |
59 | Buildings | Construction of permanent campus of IIT Gandhinagar under Phase-1 at Palaj, Gandhinagar SH: Construction of Academic Buildings, Entrance Court, tennis Courts with inernal and external civil and electrical services including internal EI, Fire Fighting, Electrical Substation, HVAC, Lift, ELV installations and Irrigation System | Field NDT, Material Testing |
60 | Airports | Modification and Refurbishment of Terminal 2 Building at Sardar Vallabhbhai Patel International Airport Ahmedabad. | Material Testing |
61 | Highspeed Rail | Mumbai Ahmedabad High Speed Rail (MAHSR-Pkg 7) Ch.489+467 to Ch 507+599 (Vatva to Sabarmati Station) under the jurisdiction of National High Speed Rail Corporation (Govt. of India Undertaking) Ahmedabad | Material Testing |
62 | Highspeed Rail | Design & Build works for construction of Sabarmati High Speed Rail Terminal for Mumbai-Ahmedabad High Speed Rail | Material Testing |
63 | Metros | Construction of Viaduct corridor from end of shreyas station (North) to Ranip station (South) and elevated six metro station, PKG-2of North-South corridor for ahmedabad metro rail project phase-1 – Old High Court Metro station | Material Testing |
64 | Buildings | Construction and Implementation Work of Faculty Houses Student dormitories & Staff House (Type 1& 2) New Academic Block JSW school of Public Policy & Sports Complex, IIM, Ahmedabad | Material Testing |
65 | Power Distrubution | Construction of Underground Water Tank & Pump House Building, External Water Supply System, storm Water Drainage System, Sewerage & System & STP, Bore Well and Road Works for POWERGRID Residentil Complex at Vadodara. | Material Testing |
66 | Power Distrubution | 765KV GIS package SS01(Bhuj-II(NEW)GIS) associated with transmission system for providing connectivity to RE projects at Bhuj-II (2000MW) in gujrat under Tariff Based Competitive Bidding(TBCB) Routr. | Material Testing |
67 | Metros | Design, supply, installation, testing and commissioning of Ballastless track of standard gauge. North South Corridor from APMC to Motera stadium in elevated and East West corridor from Thaltej Gam to Vastral Gam in elevated and underground sections along with Ballasted/ Ballast less tracks in depots at Gyaspur and Apparel Park of Ahmedabad Metro Rail Project Phase 1. | Material Testing |
68 | Road | Four Laning of Bhavnagar-Talaja Section of NH-8E from Km. 7.090 to Km. 53.585 (Design chainage from Km. 6.945 to Km. 54.990) (Package-1) in the state of Gujarat to be executed on Hybrid Annuity Mode under NHDP Phase- IV. | Material Testing |
69 | Railways | RFP for execution of approach & exit ramp on front side of hotel building above Gandhinagar railway station work for development of 300 rooms hotel at the airspace above Gandhinagar railway station, Gandhinagar, Gujarat | Material Testing |
70 | Metros | Design, const. and completion of Underground stations and tunnel includ. Finishes from Kapodra Ramp to Surat Rail. station from chain 3700m to chain 7160.6m, comp. twin bored underground tunnel between north. ramp and Surat Rail Metro station all cut and Cover portion includ. 3 underground station viz. Kapodra, Labheshwar Chowk and Central Warehouse with entry/exit & connecting subway by Box pushing method and a portion of NATM and Launching and receiving chambers of TBM for Surat Metro Rail Project | Material Testing |
71 | Port | Chhara Breakwater Project | Material Testing |
72 | Road | Construction of left out works including Junagadh bypass (Length 19.80km.) on four laning of Jetpur – Somnath section of NH-151 (Old NH-8D) between Km. 0+000 to 123+454 in the state of Gujarat | Material Testing |
73 | Buildings | Construction of 18 Nos. Coastal Border Out Post for Gujarat Marine Bn. BSF on Composite BOP Pattern (SH: Constructionof composite BOP’s for 3 Nos. Coy Level at Karmata South, Akri & Gunau and 6 Nos. Platoon Level at JP Jetty, Karmata Village ABG Cement, Walariwand, Sanghi Cement & Bhaneriwand) Package-II | Material Testing |
74 | Buildings | Construction of Affordable housing development (1120 EWS-II) at Zundal TP-72 FP 123 in Auda area (Job No. – 12/2020-21) | Material Testing |
75 | Oil & Gas | Civil & Structural works-1 for residual utilities and offsite (RU & O) for rajasthan refinery project of M/s HRRL Part A | Material Testing |